Tower lighting

Date:
2013-09
Client: Serco
Contract Name:Tower lighting
Site Location: Curtin Immigration detention Centre
Year: 2013
Scope of Work:
Installation of 4 x 16m lighting towers and 10 street lights
- Lighting design and layout
- Ground survey
- Excavation, conduit and cable installation
- Concrete and Rag bolt assemblies installation for standing/fixing of the Lighting Towers.
- Alterations and additions to the Existing Main Switch Boards to cater for the upgrade.
- Termination of lighting tower

